Air Conditioning

Cooled (or heated) air flow from the air conditioner will be reflected from obstacles and come back with the same temperature, with a "left". Air Conditioning decides that work is done, the right climate and set off. That's happened to my friends. Their air conditioning constantly, "entangled in curtains "and disconnected, unable to bring the temperature up to a given room. I had to call the experts and re-install the system. 5. … Out of alignment – then out of it on the floor will follow the water (condensate), which according to the rules assembly should be given to the drainage tube in a special tank (see our certificate of drainage).

Fourth stage: the walls or floor shtroblenie In order to connect electrical wires and freon tubes between the air conditioner unit Installers punch trough the walls or ceiling (or as they say installers – to be "proshtrobit line"). This is done in case you want to do a hidden line. Sometimes you have to "proshtrobit", for example, Wall and floor apartment. Do not want to Stroebe? Then you can hide the wires in decorative plastic box (sometimes box removed under the plinth). But before that installers will need to connect the two copper tube (refrigerant) and "Ends" of wiring between the external and internal blocks. Make sure that the installers have done this by connecting fittings. And in the pre-punched hole in the outer wall paved "Waterproof glass "with a connecting hose. Adjusters come into place all the necessary equipment is placed in communication Stroebe, drainage tube is placed in Stroebe sloped Then they have to spend so-called vakuumatsiyu communications, and always within 50 minutes (just for this time of the communication will go the "extra" air and moisture).